Seattle Hill Road Preservation Project

Description: The Seattle Hill Road Preservation Project will repair damaged asphalt, median curbs, upgrade curb ramps and install needed pedestrian signals. In 2016, the road pavement condition index (PCI) was rated at 59 on a scale from 0 to 100. The current PCI is lower than it was in 2016, most likely a score in the mid to low 50s. If the City delays the project any longer, instead of a roadway rehabilitation project a roadway reconstruction project will be needed. The latter is more costly and takes longer to complete. With more than 16,000 people using Seattle Hill Road every day, it is essential that the City complete this project. The COVID-19 pandemic and shutdown has given the City the window needed to complete this project with minimum impact to the public.
Project Details: Grind and overlay new asphalt, replace damaged median curbs, upgrade ADA curb ramps and install accessible pedestrian signals at two intersections between Village Green Drive and 35th Ave SE.
 paving project
Contractor: Kamins Construction
Project Timeline: June through September 2020
Total Project Budget: $1.86 Million
Documents: Feb. 25, 2020 - Mill Creek City Council agenda packet
UPDATES: Workers will be providing traffic control and demolishing and replacing curb ramps, overlaying pavement, and installing new pedestrian signals along Seattle Hill Road between 35th Ave SE and Village Green Drive from 7 a.m. to 5 p.m., Monday through Thursday, through the end of August.
The grinding and removing of old pavement on Seattle Hill Road will begin Monday, July 13 through Friday, July 17 as part of its preservation project. 
The construction will take place between Village Green Drive and 35th Ave SE. The paving portion of the project will occur Friday, July 17 through Thursday, July 23. Motorists should expect traffic delays.

map
Matt Feeley
Project Engineer
Email
Phone: 425-921-5745

City of Mill Creek
Public Works and Development Services
1578 Main St. 
Mill Creek, WA  98012 

 

Construction schedules are subject to change.