Stages of Capital Improvement Projects
City of Mill Creek Capital Improvement Projects are typically each at one of four possible Stages in delivery:
1. Concept
2. Scoping
3. Design
4. Construction
Projects that are in either the Design or Construction Stages are considered to be "Active" and information on the project can be found by following the project links below.
The City will update these pages on a monthly basis, though more frequent updates during the Construction Stage may occur when needed.
Capital Improvement Projects In the Design Stage
2022 Grade C Stormwater Pipe Rehabilitation
Silver Crest Park Rehabilitation
Capital Improvement Projects In the Construction Stage
2021 Grade C Stormwater Pipe Repair
2021 Complete Streets Pedestrian Improvements